REPV_LOGO_PLACEHOLDER

The Complete Lifecycle of Solar
We Handle It All

From new solar installations and panel recycling, to investing in recycling equipment — choose your service and calculate your ROI instantly.

01
☀️
EPC Construction Service
Planning a new solar installation? We handle everything from design to construction, with standard or easy-disassembly modules.
Calculate Cost Difference →
02
♻️
Module Recycling Service
Have old or broken panels to process? We extract silver from the backsheet and return cash directly to you.
Calculate Silver Recovery Value →
03
🏭
Recycling Equipment Purchase
Want to enter the solar recycling industry? Our equipment processes damaged and bent modules for a fast business start.
Calculate Equipment Revenue →
☀️
EPC Construction Service
Cost Difference Calculator
Easy-Disassembly vs. Standard Module — Initial cost difference and long-term recovery ROI
1
Cost Calc
2
Project Details
3
Done
💰

Enter Cost Information

NTD/panel
Market price approx. NT$ 4,500–6,500
NTD/panel
Typically 10–20% higher
panels
NTD
Initial Cost Difference
easy-disassembly vs standard
Estimated Payback Period
via silver recovery
Standard Module Total Cost
VS
Easy-Disassembly Module Total Cost
Silver Recovery Payback Progress
Year 1
Based on average silver content 20g/panel, 85% recovery rate, silver spot price 30 USD/troy oz to estimate annual silver recovery. Actual recovery amount based on post-processing pricing.
📋

Let Us Plan Your Detailed Solution

Fill in your project details and our consultant will provide a complete quote with easy-disassembly module options within 1 business day.

♻️
Module Recycling Service
Silver Recovery Value Calculator
Enter module count or weight to estimate your cash return
1
Silver Calc
2
Contact Info
3
Done
🪙

Enter Module Information

Damaged modules: intact backsheet for silver refining, lower recovery rate
panels
Estimated Return Amount
NTD
Recoverable Silver Weight
g
⚗️
troy oz
💵
USD
📦
Panels / Weight
Estimated based on silver spot price 30 USD/troy oz, exchange rate 32 TWD/USD. Damaged modules ~75% recovery, bent and normal decommissioning ~85%. Actual pricing based on post-processing assessment.
📦

Ready for Us to Handle It?

Leave your contact info. Our consultant will confirm module condition, arrange pickup, and return cash after refining.

🏭
Recycling Equipment Purchase
Equipment Capacity & Revenue Calculator
Estimate one unit's daily processing capacity and annual potential revenue
1
Equipment Calc
2
Requirements
3
Done
⚙️

Equipment Specs & Operating Conditions

Estimated figures; contact sales for actual specs
units
panels/day
※ Adjust after confirming actual specifications
days
g/panel
Monocrystalline ~18–26g, Polycrystalline ~14–18g
Annual Potential Silver Recovery Revenue
NTD / year
Annual Total Volume
panels
ItemValue
Annual panels processed
Annual silver recovered (incl. recovery rate)
Annual silver (troy oz)
Annual revenue (USD)
Annual revenue (NTD)
Estimated based on silver spot 30 USD/troy oz, exchange rate 32 TWD/USD. Mixed type 80% recovery, damaged 75%, normal 85%. All figures are estimates; confirm actual equipment specs and efficiency with sales.
🤝

Interested in the Recycling Equipment Business?

Fill in your requirements. Our sales team will explain equipment specs, installation conditions, and provide an actual quote.